Here is where I would start: pick a day when the building is damp but barely calling for cooling. That is the day that tells you whether your outdoor-air selection is doing what you expect.
On a mild, humid day the space thermostat may be satisfied while the ventilation air is still bringing in moisture. That is the condition to put on the selection sheet when looking at a dedicated outdoor-air system. Transaera announced in September that it would work with KCC Manufacturing in Kentucky to build more of its desiccant-based units. KCC’s role includes cabinet production, integration, and work on the next cabinet design.
Transaera uses a metal-organic-framework desiccant to pull moisture out of incoming air. The company says its material can be regenerated at a lower temperature than conventional desiccants. For the buyer, the value of that change depends on the power needed to deliver the required supply-air dew point at the job’s actual outdoor-air volume.
Ask competing suppliers to select at the same conditions. Give them outdoor dry-bulb and moisture conditions, scheduled airflow, external static pressure, and the required supply-air dew point and temperature. Include a part-load point representative of mild, humid weather. Ask what the unit does with the air between moisture removal and discharge, including any reheat or trim cooling included in its electrical input.
Transaera reports energy savings of 40% against conventional packaged DX equipment. Before that number enters an owner’s estimate, ask for the test conditions and what was included in the comparison. Fan energy, reheat, regeneration, and the delivery-air target can all change the result. Put the same assumptions into both annual estimates and keep peak demand separate from annual energy.
The production announcement is a reason to request a current lead time and service plan. Get the submittal for the exact build, including who owns controls startup, what alarms reach the BAS, how the desiccant assembly is serviced, and how replacement parts are ordered. At turnover, trend entering and leaving air temperature and humidity along with fan and equipment status. That gives the owner a record of moisture-control performance after the balance report is signed.
Ask the rep to show the same outdoor-air load under two cases: a hot design day and a mild but humid day. Compare the supply-air condition and the electrical input in both cases. Put the two selections next to each other, with the controls sequence attached, so the discussion stays about the building instead of which brochure has the biggest number.